Contact Us

Tel: +86-757-86685210

Fax: +86-757-86685210

Mob: +86-18802068132

E-mail: info@jensysenergy.com

Add: Floor 2, Bldg. A, Tangtou Tech Ind. Zone, Shishan Town, Nanhai Dist., Foshan, Guangdong,China

Home > News > Content
InterSolar South America Jun 28, 2018

9.png

Intersolar, SouthAmericaInternational Solar Energy Exhibition, Sao Paulo,Brazil, 2018

 

Exhibition date: August 28, 2018 - August 30, 2018

 

Venue:BrazilSao   Paulo

 

Exhibition cycle: one year

 

Organizer: Solar Promotion International GmbH

 

 

Industry attribute

New energy renewable energy

 

Range of exhibition

Solar water supply systems and products; solar thermal heating equipment; solar building applications; solar modules, cells, inverters, accessories, energy storage systems, energy storage batteries, fuel cells, energy storage battery manufacturing equipment, other energy storage systems; Other solar energy applications; PV manufacturing equipment, silicon raw materials, photovoltaic materials and components, etc.

 

Exhibition introduction

Intersolar, the 5th Solar Energy Exhibition in Sao Paulo,Brazil, will be held at the Sao Paulo Northern  Exhibition Center from August 28th to 30th, 2018. It is the world's leading solar energy exhibition series, focusing on photovoltaic, photovoltaic production technology, energy storage and solar technology. Since its inception, Intersolar has become the most important industry platform for manufacturers, suppliers, distributors, service providers and partners in the solar industry.

 

The scale of the previous exhibition: 220 exhibitors and 12,000 exhibitors.

 

market background

As the sixth largest economy in the world,Brazilis no longer a spectator outside the solar market. According to the Brazilian electric power regulator ANEEL, the current installed capacity of photovoltaic inBrazilis 20MW, most of which are installed in remote areas and belong to the off-grid system. In addition, the Brazilian Ministry of Mines and Energy's research institute said it has selected 17 total scale 23.6MW projects to “assess the technical and commercial arrangements for connecting solar projects to the grid”, which is planned to be launched within three years. The International Energy Agency said that after ANEEL launched a net metering mechanism in April this year, companies are looking to reduce energy costs, and the commercial and industrial rooftop PV market is expected to prosper.

 

Brazil successfully held its first photovoltaic power generation auction in Pernambuco in December 2013 with a total contracted amount of 122.8 MW. For the national photovoltaic power generation auction to be held on October 31 this year, the industry is generally expected to be extremely high. The total contracted value is estimated to be 500-1,000 MW, and the total capacity of the project to be auctioned is as high as 10.8 GW. At present, the Brazilian power grid only connects about 200 small and medium-sized distributed power generation systems, which is still lower than the expectations of the Brazilian National Electricity Authority (ANEEL) and the National Planning Agency (EPE). Although the net metering price is implemented through the tax policy (Net Metering) There are still obstacles, but the photovoltaic power generation auction system will rapidly increase the installed capacity of photovoltaic.